UDT01 Links Tab of the UDT09 Screen
Use the UDT01 Links tab of the UDT09 screen to manage UDT01 links.
If Time & Expense is co-deployed with Costpoint, the Direct Links subtask is read-only and modifications must be made directly within Costpoint.
Note: The Direct Link or Wildcard subtasks display conditionally, depending on how link options are set on the UDT options tab of
. For example, if the UDT is configured as a direct link, the subtasks related to Wildcards do not display, or conversely, if configured as Wild Card, the Direct Links subtasks do not display.
UDT01 Direct Links Subtask
Note: This table is not editable when Time & Expense is co-deployed with Costpoint.
Field | Description |
---|---|
UDT01 |
This column displays the currently linked UDT01s. |
Description |
This column displays the currently linked UDT01 descriptions. |
UDT01 Wildcard Links Subtask
Field | Description |
---|---|
UDT09 |
This column displays the currently linked UDT09. |
UDT01 |
This column displays the currently linked wildcard UDT01. |
Parent Topic: UDT09S